• Thu. Jun 26th, 2025

24×7 Live News

Apdin News

Abu Dhabi pledges $205m for GCC power grid interconnection

Byadmin

Jun 26, 2025


The 400kV double-circuit overhead transmission line extends 96 kilometres from Al-Silaa in the UAE to Salwa in Saudi Arabia

Become a MEED subscriber for unlimited access to:

By admin